What this demo shows

An AI model that was never trained on data from San Francisco’s December 20, 2025 blackout predicts its 911 emergencies from the outage, weather and calendar, then re-runs the day with power back at 3 pm.

Model trained on

San Francisco fire & EMS incident history (type, fire district, time) from before May 2025, alongside the power-grid state, weather and calendar at each moment.

What Dark Saturday proves about the approach

Supports exact, unlimited what-if analyses

Rewind to any moment, change one thing and run it again. Everything the change doesn’t reach stays identical byte for byte, so every difference comes from your change.

In demo

Restore the Mission substation at 3 pm and about 135 emergencies per run never happen. Battalion 10, outside that substation’s reach, came out identical in all 5 runs.

See it in 2 Rewind

Delivers precise causal tracing of events

Point at any single event, trace what caused it, and test whether it would still have happened without that cause, within the model.

In demo

A 3:03 pm electrical-hazard call in the Sunset exists only because of the outage. The outage raised the model’s rate for that call about 190-fold, and with power restored it never happens.

See it in 3 Why

Compute efficient training and inference

Trained and run on ordinary CPUs. Compute is spent only where something happens, so quiet parts of the world cost nothing.

In demo

Twelve days of the city simulated in about 78 seconds on one CPU processor. Built, trained and run entirely on CPUs.

Results describe the trained model, not a guarantee about the real world. Inferred details (routes, which buildings went dark) are labeled in the demo.

Dark Saturday

San Francisco, Saturday, December 20, 2025: the blackout replayed on the real city from 911 dispatch, grid-outage and building data, then rewound by an event-driven world model. Read the essay.

World model output
 
 
Customers out
 
 
ENGINES
TRUCKS
MEDICS
loading…
World model output

Beat 1: The model was never told

Saturday, December 20, 2025: a fire at PG&E’s Mission substation (1:09 pm) leaves about 130,000 customers, roughly 30% of the city, dark within two hours. The city is Google’s photorealistic 3D San Francisco, and each of 168,674 LiDAR-measured building footprints is tinted by its power state. Drag the divider: real 911 dispatch on the left, the event-driven world model’s own rollout on the right, from 12:55 pm onward. The model was trained only on data from before May 2025 and given only the real grid, weather and calendar. Its incident locations are drawn from past incidents of the same battalion and class, not measured. Its unit trails are its own dispatches, station to incident in a straight line, timed from assignment to release in its service log: inferred routing, real timing.

About this beat

  • Left of the divider is measured: SFFD calls and every engine, truck and medic trip, routed on the street graph. Right of it is the model’s own output from its committed logs, run 1 of 5.
  • Counters start at 12:55 pm, when the model takes over. The model’s “trucks busy” is its service log’s own count of open truck assignments.
  • Which buildings are dark. EAGLE-I is county-level: it says how many customers were out, not where. A deterministic fraction of the buildings in the reported-dark neighborhoods turns steel blue as the county curve rises toward its peak; buildings elsewhere stay lit. It is a visualization, not a claim about which buildings lost power. Both sides show the same buildings, because the model is given the real grid.
Example use cases for critical infrastructure

Restoration priority

Which substation or feeder to bring back first to avoid the most emergencies, tested before crews roll.

Utilities

Planned shutoffs

Run a wildfire safety shutoff on the model first and see which neighborhoods and services take the hit.

Utilities, regulators

Where to stage units

Test where one extra engine or ambulance does the most good during an outage, storm or heat wave.

Fire & EMS

After-action review

Show which calls the outage caused and which it didn’t, with a traceable cause for each.

Cities, regulators, insurers

Backup power rules

Estimate how many elevator rescues and hazards backup power in high-rises or signals would prevent.

City planning, building owners

Provenance

City: Google Photorealistic 3D Tiles, graded to night on this page. Buildings: DataSF’s 177,023 LiDAR-derived building footprints (ynuv-fyni), simplified (Douglas-Peucker, slivers under 15 m² dropped) to 168,674; each is a volume from its measured ground to its measured roof peak that tints the photoreal mesh inside it. Neighborhoods: DataSF’s 41 Analysis Neighborhoods (j2bu-swwd). SFFD Fire Department Calls for Service: DataSF, Dec 16–23, 2025 unit-level rows, for incidents, fleet gauges and every engine, truck and medic trip, routed on DataSF’s street centerlines (3psu-pn9h). EAGLE-I San Francisco County customers out: Oak Ridge National Laboratory, 15-minute resolution, CC BY 4.0, shifted from UTC to Pacific time. Fire stations (DataSF, wt27-4jim) and ED hospitals (OpenStreetMap, emergency=yes) locate trip origins and destinations. Mission Substation: 66 8th St (OSM way 35115839; PG&E), fire at about 1:09 pm. High-voltage lines: HIFLD Electric Power Transmission Lines, clipped to SF.

Inferred, and labeled as such:

The ~30% figure is PG&E’s own; no share of the city is computed from EAGLE-I’s modeled customer total.

World model output

Everything marked “World model output” is read from the event-driven San Francisco world model’s committed logs: five runs, each with and without the intervention, warm-started on real history through 12:55 pm Dec 20 and generated by the model alone from there. Only model-generated incidents are counted; replayed history is excluded everywhere. Each beat’s own notes sit with its text above.